Total Project
Value: |
$ 600 k |
Period of Performance: |
3 weeks |
Client: |
Con Edison |
Mobilize more than 150 trained personnel to deal with
numerous types of contaminants as a result of the September
11th, 2001 terrorist attack. Work involved the excavation
of ‘Freeze Pits’ and the cutting of roadways
and excavation of slot trenches for the temporary ‘shunting’ of
electrical power, shut down of electrical and gas services.
Fabrication and installation of pipe and fittings to restore
gas service and personnel, debris removal and equipment
decontamination.
Hallen mobilized 15 backhoes, 5 welding rigs, 20 support
vans and 3 dump trucks to support this time critical project.
|
Back to index of past projects...
|