Past Projects > Kings Plaza, Brooklyn, NY                           

Total Project Value:
$ 1.8 Mil
Period of Performance:
2 Months
Client:
CODE Environmental /
Confidential Realty Developer

Mobilize, site clearing, excavation and load-out of over 6,000 tons of petroleum contaminated soils and debris including the remains of 12 large former AST’s from 5 areas of concern. Size, transport and dispose of the scrap steel, asphalt, concrete and soils for recycling / disposal and backfill the numerous excavations. The work, mandated by the NYDEC, was performed at this former Oil distribution terminal to allow for future construction.

Over 20 personnel many donned in level C personal protection, 2 Excavators, Roller, Dozer, Soil Screener, Concrete crusher, 2 Front end loaders, Grappler, Hammer, Bobcat with sweeper, 2 Odor suppression systems, dewatering pumps, 2 Frac tanks and an Off-Road dump truck and two support vans were deployed on this project.