Total Project
Value: |
$ 1.8 Mil |
Period of Performance: |
2 Months |
Client: |
CODE Environmental /
Confidential Realty Developer |
Mobilize, site clearing, excavation and load-out of over
6,000 tons of petroleum contaminated soils and debris including
the remains of 12 large former AST’s from 5 areas
of concern. Size, transport and dispose of the scrap steel,
asphalt, concrete and soils for recycling / disposal and
backfill the numerous excavations. The work, mandated by
the NYDEC, was performed at this former Oil distribution
terminal to allow for future construction.
Over 20 personnel many donned in level C personal protection,
2 Excavators, Roller, Dozer, Soil Screener, Concrete crusher,
2
Front end loaders, Grappler, Hammer, Bobcat with sweeper,
2 Odor suppression systems, dewatering pumps, 2 Frac tanks
and an Off-Road dump truck and two support vans were deployed
on this project.
|