Total Project
Value: |
$ 25 Mil |
Period of Performance: |
6 Months |
Client: |
Iroquois Gas Transmission System |
Mobilize and excavate 5000 LF of trench and the installation
of a 20-inch diameter High Pressure gas transmission main
taken from the receiving point at waters edge to a newly
constructed Metering Station. Excavation and load-out of
soils encompassing the entire top three feet of this former
Con Ed MGP site contaminated with Coal Tar residues (BTEX),
backfill and restore the property then dewater the trench
to bring the gas line to the new Metering Station. Over
20 personnel, 3 excavators, 5 welding rigs, 5 support vans
and
numerous trench boxes were deployed to complete this project. |
Back to index of past projects...
|