Representative Past Project Abstracts
Ravenswood,
NY
Total Project Value: |
$ 1.4 Mil |
Period of Performance: |
5 Months |
Client: |
KeySpan Energy Corporation |
Mobilize, excavate and load-out 5,000 cubic yards Coal
Tar residue (BTEX) contaminated soils from a 1200 LF perimeter
trench within the foot print of a planned future power
generation plant construction at a former MGP site. read
more >>
 |
| |
Bronx
M & R (Iroquois)
Total
Project Value: |
$ 25 Mil |
Period of
Performance: |
6 Months |
Client: |
Iroquois Gass Transmission System |
Mobilize and excavate 5000 LF of trench and the installation
of a 20-inch diameter High Pressure gas transmission main
taken from the receiving point at waters edge to a newly
constructed Metering Station. read
more >>

|
| |
World
Trade Center,
NY
Total
Project Value: |
$ 600 k |
Period of
Performance: |
3 weeks |
Client: |
Con Edison |
Mobilize more than 150 trained personnel to deal with
numerous types of contaminants as a result of the September
11th, 2001 terrorist attack. read
more >>

|
| |
Kings
Plaza,
Brooklyn, NY
Total
Project Value: |
$ 1.8 Mil |
Period of
Performance: |
2 Months |
Client: |
CODE Environmental /
Confidential
Realty Developer |
Mobilize, site clearing, excavation and load-out of over
6,000 tons of petroleum contaminated soils and debris including
the remains of 12 large former AST’s from 5 areas
of concern. read
more >>

|
| |
Hexagon
Labs, Bronx,
NY
Total
Project Value: |
$ 2.8 Mil |
Period of
Performance: |
3 Months |
Client: |
CODE Environmental /
Confidential
Pharmaceutical Company |
Mobilize, site clearing and the ‘surgical’ excavation
/ load-out of almost 6,000 tons of soils, debris and concrete
removed to six feet depth or bedrock (whichever was encountered
first) from 13 waste zones impacted with multiple types
and levels of contaminants (VOC’s, SVOC’s,
BTEX, PAH’s, PCB’s etc.) requiring off site
transportation and disposal ranging from recycling to incineration
at this 1.5 acre NYDEC regulated superfund site. read
more >>

|
| |
| |
|